ETENANO BRIDGE, METHOD OF ARC

BACKGROUND
Between the years 1982 - 1983, City Eten and other villages in the Lambayeque region and the northern part of Peru were blasted by the ravages of Nature rains and flooding sources that originated the so-called "El NiƱo", which takes place some 20 to 25 years. This year the bravery of nature made Eten City will be isolated from the neighboring villages with the fall of Eten Bridge, apart from being flooded by the waters of that river. It is from that year that the City of Divine Miracle Child irreparable harm with loss of life and disease, collapsing houses and buildings, chaos reigned in the capital of the hat.
must also remember that the same phenomenon CHILD reintroduced in 1998, some 500 houses collapsing in Ciudad Eten and was the reason that many families move to the Pampas Cascajales to form a new center called Village Villa today "The Miracle."
been many governments offering Eten Bridge construction, leaving only on policy proposals, but thanks to our PAISANO ETENANO have reached important positions in politics and more still of the ruling party, made all-important in many works for Eten and especially the construction of the desired bridge, which is now a reality. THANKS DR. JAVIER VELASQUEZ! ...


OF A DREAM TO A REALITY



compiling the technical file
On April 18, 2008, Special Project Transport Infrastructure Decentralization - PROVIAS DECENTRALISED summoned, the First National Tender for compiling the technical file and execution of the Project: CONSTRUCTION OF BRIDGE AND ACCESS ETEN having been selected the consortium of companies: INCOT SAC-General Contractors and Engineers Pedro Lainez Lozada-SA


BUDGET
The total budget between the development of the design and the construction of the project is S /. 10 `701, 502.07 (ONE HUNDRED TEN MILLION TWO HUNDRED THOUSAND TO 07/100 NUEVOS SOLES), since compiling the technical file FINAL amounts to 410.000. 00 (FOUR TO TEN THOUSAND 00/100 NUEVOS SOLES) and the execution of the Works amounting to S /. 10 `291, 502. 07 (TEN MILLION TWO HUNDRED NINETY-ONE THOUSAND TWO HUNDRED AND 07/100 NUEVOS SOLES WITH)


DEADLINES FOR THE DEVELOPMENT AND EXECUTION OF THE WORK
The deadline for drawing up the dossier Force is 105 (FIVE HUNDRED DAYS) from the day following the delivery of the land.
The deadline for the execution of the work is 360 (three hundred sixty days), but in fact the work was completed ahead of deadlines in the contract.


WAY BRIDGE:
Eten The modern bridge is an arc for the reasons detailed below: first, because its waters are visiting various places from the river milk to pour their waters into the sea via the River make this tour Eten bring a lot of sand or soil, making the volume of water are increasing, which is why it was thought in the form of an arc, a second reason is the architecture, which gives another way to bridge out of the ordinary of old buildings.


ETEN BRIDGE AND DEFENSES riverine
actually preparing the technical file must have two fundamental elements of construction: First and Second Bridge, riverine defense. Because the big question would be what would happen if water flows are strong and the bridge has no defense, the answer you already have it.
far as is known is that the central government would invest in the development of the design and construction of the bridge, while the government invest in regional riverine defense. But thank God, now only has built a riverine part of the defense, which would not guarantee many years of stay in this modern bridge etenano.